Archives for Transport

Rail Operating Centre

Rail Operating Centre (Midlands) Project Name ROC Date July 20, 2015 Category Transport About This Project Cable Dynamics were employed directly by Network Rail to install a Brand Rex 10GPlus F/FTP (Category6A) Cabling Solution at a newly built Rail Operating Centre in the Midlands. The building has a planned 75 year life span, so with this in mind the project required a fully flexible system, able to cope with future moves and changes for many years to come. We installed a total of 4351 10GPlus cables; consisting of 3551 Outlets to Desk and 800 Cabinet to Cabinet Links. Each Control
Read More